No, there are no public footpaths, bridleways or byways either within or close to the site. 

Ecological surveys are underway, and measures will be put in place to protect and enhance local habitats. A minimum 10% biodiversity net gain will be delivered across the site.

Solar farms are generally quiet, but noise from inverters may occur. A Noise Impact Assessment will be prepared to ensure that any noise disturbance is minimal and does not impact on nearby residents. This will also take into account the noise generated during construction works.

Construction will take about 12 months, with work happening Monday to Saturday during daytime hours.

Along with renewable energy, the community will receive direct benefits. These will be discussed at the appropriate time.

The Natural England map classifies the land on the site as Grade 2 (very good) and Grade 3 (good to moderate) quality soils. An Agricultural Land Classification Assessment will be prepared. 

The surrounding landscape, site topography, existing vegetation and proximity to a point of connection to the Grid make it well suited for solar development.